Skip to content

Large Residential Property Development  

Project Name

Project Location

Greater Sydney Area, New South Wales

Client

Confidential

Related Services

Project Description

The large residential development involved the redevelopment of rural land adjacent and a large municipal landfill in Greater Sydney Area, New South Wales. As part of the development requirements a Landfill Gas Risk Assessment (LFGRA) was to be undertaken to assess the potential risks to the proposed dwellings, as well as assess potential groundwater impacts.

The LFG assessment involved a combination of spot and continuous gas monitoring on bores installed along the perimeter of the site. The data was used to undertake the LFGRA coupled with a Conceptual Site Model (CSM). This information was then in turn used to design a gas mitigation system to ensure the long-term protection of the residential dwelling adjacent the closed landfill.

The main disciplines undertaken included the following:

  • Continuous and spot gas monitoring
  • Drilling works and monitoring well installation
  • Development of a Conceptual Site Model (CSM)
  • Landfill Gas Risk Assessment (LFGRA)
  • Design of a LFG mitigation system

The site has a number of unique aspects that presented both technical and financial challenges. Through the use of continuous monitoring equipment, a robust LFG risk assessment was achieved which in turn informed the design basis of the gas mitigation system.

The main disciplines undertaken included the following:

  • Continuous and spot gas monitoring
  • Surface gas emission assessment
  • Services investigation and field investigations
  • Drilling works and monitoring well installation
  • Development of a Conceptual Site Model (CSM)
  • Landfill Gas (LFG) Risk Assessment
  • Odour modelling
  • Design of a LFG mitigation system
Our experience

A selection of related projects